Earthmovers doing cut work on hole #4, as you can see

there is a cut of over 8 feet.

Excess sandy soil being removed to allow for the

building of a pond at #5 green.

Bridge work getting started at #17 green site.

Bridge work complete at #17 green site. Headwall and

rock wall still need to be built.

Final contour shaping of subgrade of green at hole #2.  Surveying stakes added to help ensure proper depth of greens mix. 

Another angle of subgrade work at #2 green site.